Expansion Joint Field Report Cejka Industrial / Valtech Engineering

Field Intake

Quick expansion joint inspection report

Capture STP, the 3 M's, obstruction clearances, field photos, blueprints, and thermal images from an iPad or phone.

Job Info

Site and asset

STP

Size, temperature, pressure

3 M's

Media, movements, material

Obstructions

Photos and clearance measurements

Add nearby pipe, steel, walls, guides, drains, instrumentation, or anything that may restrict installation or movement.

Clearance measurements

Measure from the obstruction to the nearest point of the expansion joint.

Blueprints

Expansion joint drawings and plans

Capture nameplates, layout sketches, takeoffs, or blueprint pages that define the joint or surrounding piping.

Thermal

Thermal images

Add infrared or thermal photos showing hot spots, insulation gaps, process gradients, or unusual heat patterns.

Notes

Findings and recommendations

PDF Report

Report preview

Tap Generate PDF to build the report below, then use the device print/share option to save it as a PDF.

No report generated yet

Complete the field form, add photos, and tap Generate PDF.